Well.....new torsion bar arrived, I handled it like a stick of dynamite! Routine re-assembly(not touching anything), but I found it took three tries to get correct tension.
1) Raise door so the roof section(of door) is almost vertical and install bar with locking plate/mount so far side is tilted towards you, close side touching glass glazing.(this is about 2-3 splines from horizontal)
2) Rotate bar and mounting plate to horizontal position and install bolts, then carefully check door droop.
3) Repeat procedure until door's opening is 2-4" from close. (@ elvis thanks for suggestion worked fantastic)
3a) I had to repeat this twice to get door opening proper(
No Bounce either), two splines at a time.
So once again I'm very happy with my car, didn't have to contribute to the Cuss Jar either.....
@ captainneo I found about 4-6 splines from start to get proper tension as described above.