Tomcio
11-21-2014, 01:13 PM
Hello everyone,
I am offering my stainless steel frame project. It is a copy of the original frame but everything is made out of 304 stainless. The frame needs to assembled at it is a bunch of separate parts now. There is one piece missing and will have to be cut and shaped for the frame to be complete.
Front frame extension aka. crumple tube is complete and assembled. It is reinforced and front extension recall kit will not be needed.
Center tunnel section has the shifter plate installed - manual transmission, with all stainless nuts. Shift mechanism can be bolted in.
Front cross section is complete.
Rear cross section is mostly complete - bottom plate needs to be welded on.
The rest are all separate pieces, some are just cut out raw pieces, some are bent to the required shape.
TIG welded. Lots of welding required to complete this frame.
Complete frame will weigh a little more than the original one (with epoxy). I have used slightly thicker material because the frame was calculated to handle at least 300 HP.
Pictures coming tomorrow.
Available for pickup just outside Warsaw, Poland. Map coordinates in my signature.
All components of the frame should fit on a pallet but buyer will have to arrange shipping. I don't even know how to ship such a thing.
Price - €3000
I am offering my stainless steel frame project. It is a copy of the original frame but everything is made out of 304 stainless. The frame needs to assembled at it is a bunch of separate parts now. There is one piece missing and will have to be cut and shaped for the frame to be complete.
Front frame extension aka. crumple tube is complete and assembled. It is reinforced and front extension recall kit will not be needed.
Center tunnel section has the shifter plate installed - manual transmission, with all stainless nuts. Shift mechanism can be bolted in.
Front cross section is complete.
Rear cross section is mostly complete - bottom plate needs to be welded on.
The rest are all separate pieces, some are just cut out raw pieces, some are bent to the required shape.
TIG welded. Lots of welding required to complete this frame.
Complete frame will weigh a little more than the original one (with epoxy). I have used slightly thicker material because the frame was calculated to handle at least 300 HP.
Pictures coming tomorrow.
Available for pickup just outside Warsaw, Poland. Map coordinates in my signature.
All components of the frame should fit on a pallet but buyer will have to arrange shipping. I don't even know how to ship such a thing.
Price - €3000