FRAMING JOHN DELOREAN - ON VOD
www.framingjohndeloreanfilm.com
-
Builder of the first Delorean Time Machine
Here's my current todo list:
- Finish installing the A/T transmission shifter (it's not totally installed….)
- Install the front brake calipers
- Bleed the brakes and install the brake lines
- Install the hand brake to the interior
- Double check all the vacuum connections, etc
- Adjust and/or fill the A/T fluid (once it's had a chance to fill the torque converter)
- Install the throttle spool and cable
- Finish wiring the Saturn alternator (I need to confirm which wire hooks up to green to energize the alternator)
- Reconnect steering rack
- Put rear vents back on
- Reinstall front stab bar
- Reinstall exhaust
- Drive it around and see what falls off
- Duct tape whatever fell off back on
- Done?
--buddy
Tags for this Thread
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules