Over the last 2 days, I installed the intake, fuel distributor/mixing unit, idle speed regulator, throttle tubes & bobbin, and most of the connections. All I have left to do on the engine refresh is the fuel lines and CPR. This is a phase of the restoration that I began in mid February, so I will be glad to see it through, and move on to something else.
image.jpg


Reply With Quote

