FRAMING JOHN DELOREAN - ON VOD
www.framingjohndeloreanfilm.com
-
Senior Member

Originally Posted by
DMC-81
I'm doing this zip tie placement right now. Basically the new rubber hose needs to be routed the same way as Jonathan's original (braided) hose to prevent it from kinking. This morning, I zip tied the hose to the hard line for the pipe that goes to the filter. I didn't tighten the tie too much to avoid it cutting into the hose. Really, it just needs to hold the hose away from the linkage.
This accumulator was a bear of a job..... one that I attempted several times (see my posts above) with shorty wrenches. No go

. I tried to have a mechanic do it as well....no go

. I thought that I'd have to have help at the upcoming local tech day. But, I think I have it conquered now, all thanks to a 17mm crow's foot.
I'll post my one handed, blind work, in a tissue box sized area when I'm done.
I swear that they (the engineers) went out of their way to make things as difficult as possible!! I cut a small section of old rubber hose and placed it over the braided fuel hose so that the zip tie could not cut into it. Then, I later removed the zip tie, and, instead, used a "s" hook, hanging from the inlet where the steel fuel line emerges... Maybe I should take a pic... Worked great!
Tags for this Thread
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules